SRADDHA Youth Camp 2019

Test content — A roof-top Solar P.V. Plant has been installed at the Ma Sarada Sadavrata building of Ramakrishna Math, Belur Math. The 400 KWp Solar Plant has been inuagurated by Swami Suvirananda ji on 15 July 2019. Solar modules are installed in arrays on the roof-top, with its input at the DC side of a single solar grid integrated inverter. The whole project has been done under the ‘PRASAD’ scheme of the Ministry of Tourism, Govt. of India.

Leave a Reply

Your email address will not be published.